Long-run steel re-roof
The most common Wellington re-roof: light, strong and quick to install, in a range of profiles and colours.

Roof replacement · Wellington
Roof Replaced Wellington
We strip the old roof, repair what's underneath and fit a new one suited to your home and the Wellington weather — with a fixed, itemised quote first.

Who we help
Process
We measure, photograph and check what's under the roof.
Material, profile and colour options with a clear price.
Scaffold, old roof off, new underlay, battens and roofing on.
Final check, site clean-up and warranty paperwork.
What's included
Scaffolding & edge protection
Included in scopeOld roof removal & disposal
Included in scopeNew underlay & battens
As requiredFlashings & ridging
Made to fitSpouting & downpipes
Optional add-onInsulation top-up
Optional add-onScaffolding & edge protection
Included in scopeOld roof removal & disposal
Included in scopeNew underlay & battens
As requiredFlashings & ridging
Made to fitSpouting & downpipes
Optional add-onInsulation top-up
Optional add-onOur approach
Clear scope, a fixed price and a weather-tight roof every night — that's the whole promise.
Service areas
From Karori to Ōtaki: see local notes on wind, coast and access for your area.
Free quote
We'll arrange a free inspection and send an itemised quote. No pressure, no obligation.
Costs, consent, asbestos rules, materials and Wellington wind zones, with sources for every figure.

Try the indicative estimator, built only on published 2026 NZ rates.

FAQ
Published 2026 NZ guides put 3–4 bedroom homes at roughly $18,000–$42,000 incl. GST; for many Wellington family homes we plan on about NZ$22,000–$40,000. See the cost guide for sources.
Usually not for like-for-like replacement of a roof over 15 years old, per MBIE. Read the consent guide.
Published NZ guides suggest about 3–7 working days for a typical home, longer for big or complex roofs. More.
Some older roofs, including some decramastic tiles, may contain asbestos. It must be tested and, if present, removed by a licensed removalist first.
Yes — the roof is closed in and weather-tight at the end of each day.